Reference list of "Generator Excitation Systems"

Customer

Performed work

Tuymen’ CHP-1, Fortum, OJSC

 

  •   Design and reconstruction of 2 high frequency excitation systems of turbogenerators  by using ARV-R (Russian: – ) equipment produced by SPC Avgust. Installation, adjustment and testing.
  •   Design, installation and commissioning of the standby thyristor excitation system based on STS equipment produced by Uralelectrotyazhmash, OJSC.
  •   Analysis and correction of the excitation system design of the generators with the rated capacities of 63 and 160 MW of CCP-1-220. Adjustment and testing of STSN (Russian: -1) and STS-2P (Russian: -2) excitation systems produced by Electrosila, OJSC.
  •   Analysis and correction of the main and standby excitation systems design of the generator 160 MW of CCP-2. Commissioning of STS-2P-270-1900-2.5 UHL4 (Russian: -2-270-1900-2,5 4) thyristor excitation system. Commissioning of STSR-1P-270-2000 UHL4 (Russian: -1-270-2000 4) standby  thyristor excitation system.

Tobolsk CHP, Fortum, OJSC

  •   Design and reconstruction of the brushless  excitation system of the turbogenerator 200MW by using ARV-R (Russian: – ) equipment produced by SPC Avgust. Installation, adjustment and testing.
  •   Commissioning of STS-2P-310-1900-2.5 UHL4 (Russian: -2-310-1900-2,5 4) excitation system of the turbogenerator 100MW
  •   Commissioning of STS-2P-210-1900-2.5 UHL4 (Russian: -2-210-1900-2,5 4) excitation system of the turbogenerator 110MW
  •   Commissioning of STSR-1P-310-1900-2 standby thyristor excitation system of the turbogenerators 3-5.

Reftinskaya GRES, Enel OGK-5, OJSC

  •   Design and replacement of the outmoded  excitation systems of the turbogenerators 8, 9, 10 with the rated capacity of 500MW of each  by STS-1V-460-6200-2.5 UHL4 (Russian: -1-460-6200-2,5 4) excitation system produced by Siloviye Mashiny, OJSC, the branch Electrosila.
  •   Design and replacement of the outmoded  excitation system of the turbogenerator 4 with the rated capacity of 300MW by STN-1V-470-3400-2 UHL4 (Russian: -1-470-3400-2) excitation system produced by Siloviye Mashiny, OJSC, the branch Electrosila.
  •   Design and replacement of the outmoded  excitation system of the turbogenerator 5 with the rated capacity of 300MW by STS-2V-520-3500-2.5 UHL4 (Russian: -2-520-3500-2,5) excitation system produced by Siloviye Mashiny, OJSC, the branch Electrosila.

Perm’ CHP-14, TGC-9, OJSC

  •    Design and reconstruction of the high frequency  excitation system of the turbogenerator 160MW by using ARV-R (Russian: – ) equipment produced by SPC Avgust

Permskaya GRES, RAO UES of Russia

  •   Repair and adjustment of STN-480-5500 (Russian: – 480 – 5500) of the turbogenerators 1, 2, 3 with the rated capacity of 800MW.
  •   Design and replacement of STN-480-5500 (Russian: -480-5500) thyristor excitation system with ARV-SDP (Russian: -) controller of the turbogenerators 1, 3 with the rated capacity of 800MW by STN-1V-470-5650-2 UHL4 excitation system with AVR-3MTk controllers (produced by  Siloviye Mashiny, OJSC, the branch Electrosila).

Kargala CHP, Orenburgenergo, OJSC

  •   Design and reconstruction of the cross field  excitation systems of 6 turbogenerators with the rated capacity of 60MW of each  by using ARV-R (Russian: – ) equipment produced by SPC Avgust.

Sakmarskaya CHP,  Orenburgenergo, OJSC

  •   Design and reconstruction of the cross field  excitation systems of 4 turbogenerators with the rated capacity of 60MW of each and the high frequency excitation systems of 2 turbogenerators with the rated capacity of 120 MW of each by using ARV-R (Russian: – ) equipment produced by SPC Avgust. Adjustment and testing.

Novo-Gorkovskaya CHP, Gorkyenergo, OJSC

  •   Commissioning of STS-300-2000 (Russian: -300-2000)  excitation system (produced by Uralelectrotyazhmash, OJSC) of the turbogenerator 100MW

Naberzhnye Chelny CHP, Tatenergo, OJSC

 

  •   Design and reconstruction of the high frequency excitation system of the turbogenerator 100MW by using ARV-R (Russian: – ) equipment produced by SPC Avgust. Adjustment and testing.
  •   Design and reconstruction of ARV-SD (Russian: -) controller of the thyristor excitation system of the turbogenerator 10 160MW by using ARV-R (Russian: – ) equipment produced by SPC Avgust. Adjustment and testing.

Kazan’ CHP-3, Tatenergo, OJSC

 

  •   Replacement of  the outmoded excitation system of the turbogenerator 6 160MW by STN-400-2500 (Russian: – 400 – 2500) thyristor excitation system produced by Electrotyazhmash, OJSC.
  •   Design and replacement of the cross field excitation system of the turbogenerator 1 60MW by STS-2P-250-1900-2.5 (Russian: -2-250-1900-2,5)  thyristor excitation system produced by Electrotyazhmash, OJSC.
  •    Design and replacement of the control board of the high frequency exciter of the turbogenerator 4 120MW by ShchV-2E-80N (Russian: -2-80) control board produced by Siloviye Mashiny, OJSC, the branch Electrosila.

Petropavlovsk CHP, Kazakhstan

 

  •   Design and replacement of  the cross field excitation system of the turbogenerator 100MW by ARV-R (Russian: – ) produced by SPC Avgust, Moscow.

 

Nizhnevartovskaya GRES, RAO UES of Russia

 

  •   Adjustment and commissioning of STN-2V-670-4200-2 UHL4 (Russian:  -2-670-4200-2-4) excitation system of the turbogenerator with the rated capacity of 800 W.
  •   Maintenance service of STN-670-4200-2E UHL4 (Russian: -670-4200-2 4) thyristor excitation system of Unit 1 and STN-2B-670-4200-2 UHL4 thyristor excitation system of Unit 2.

Krasnoyarsk CHP-3, Yenisey TGC (TGC-13)

 

  •   Adjustment and commissioning of STSR-1P-3200-500 UHL4 (Russian:  -1-3200-500 4) standby thyristor excitation system of the turbogenerator TG-1 with the rated capacity of 220MW

Surgutskaya GRES-2

 

  •   Design and replacement of  the outmoded thyristor excitation system with ARV-SDP controller (Russian:-)  of  the turbogenerator 4 800MW  by  STN-2V-660-4250-2 UHL4 (Russian: -2- 660-4250-2 4)  excitation systems produced by Electrosila, OJSC.

 

Zagorskaya PSPP, RusHydro, OJSC

 

  •   Design and replacement of  the outmoded excitation systems of 6 water-powered generators 200MW by  STS-1E-264-1860-2.5 UHL4 (Russian: -1-264-1860-2,5 4) thyristor excitation systems produced by Electrosila, OJSC.
  •   Maintenance service of STS-1E-264-1860-2.5 UHL4 (Russian: -1-264-1860-2,5 4) thyristor excitation systems

Ust’-Ilimsk HPP, Irkutskenergo, OJSC

 

  •  Design and replacement of the outmoded excitation systems of 12 water-powered generators 240MW by  STN-410-1650-2.6 UHL4 (Russian: -410-1650-2,6 4) excitation systems produced by Electrosila, OJSC.

Bratsk HPP, Irkutskenergo, OJSC

  •  Design and replacement of the outmoded excitation systems of 12 water-powered generators 260MW by  STN-M-480-1870-3.2 UHL4 (Russian: --480-1870-3,2 4) excitation systems produced by Electrosila, OJSC.

 

Kamskaya HPP, RusHydro, OJSC

 

  •  Design and replacement of the outmoded excitation systems of 12 generators (with rated capacities of 21 and 24MW) by  STS-1E-220-1200 YHL4 (Russian: -1-220-1200 4) thyristor excitation systems produced by Electrosila, OJSC