Reference list of "Installation of Fiber Optic Lines"

Customer

Statement of work

Backbone electric grids (MES) of Siberia

  •   Installation of ADSS on the high voltage line 220kV at the section D-102 “Razdolinskaya-Gorevskiy MCC”.and OPGW on the high voltage line 220kV at the section D-91 “Abalakovskaya-Troitskaya”, ADSS and OPGW on the high voltage line 220kV at the section D-81 “Nazarovskaya GRES-Troitskaya”. The total length is 235km.

Backbone electric grids (MES) of Ural

  •   Installation of ADSS and OPGW on the high voltage lines 220kV at the sections “YuGRES-Shagol 2”, “YuGRES – Shagol 3” with the branch line to Isakovo SS, “YuGRES-KS-19”, “KS-19-Chebarkul’”. The total length is 150 km.

Federal Grid Company of Unified Energy System, OJSC

  •   Installation of ADSS on the high voltage line 220kV at the section “Yaivinskaya GRES- Severnaya SS”. The total length is 15 km.

Motiv, LLC

  •   Installation of ADSS on the high voltage line 110kV at the section “Otradnaya SS-Petrishchevskaya SS-Yuzhnaya SS-Nizhneisetskaya SS”. The total length is 40 km.

Motiv, LLC

  •   Installation of ADSS on the high voltage line 110kV at the section “Ekaterinburg-Nizhniy Tagil”. The total length is 139 km.

Motiv, LLC

  •   Installation of ADSS on the high voltage line 110kV at the section “Ekaterinburg – Kamensk-Yral’skiy”. The total length is 100 km.

MTS, OJSC

  •   Installation of ADSS on the high voltage line 110kV at the section “Perm’-Kachkanar”. The total length is 390 km.

Severnoe volokno, OJSC

  •   Installation of ADSS and OPGW on the high voltage line 110kV at the section “Siren’ SS – Tyumen’ Region”. The total length is 260 km.

OGK-1, OJSC

  •   Installation of ADSS on the high voltage line 110kV at the section “Iriklinskaya HPP - Iriklinskaya GRES”. The total length is 40 km.

Motiv, LLC

  •   Installation of ADSS on the high voltage line 110kV at the section “Serov SS – Krasnoturinsk SS”. The total length is 40 km.

Backbone electric grids (MES) of Ural

  •   Installation of ADSS on the high voltage line 220kV at the section “NSv CHP - Yuzhnaya”. The total length is 10 km.

Backbone electric grids (MES) of Ural

  •   Installation of ADSS on the high voltage line 220kV at the section “SUGRES – Kalininskaya”. The total length is 20 km.

Backbone electric grids (MES) of Ural

  •   Installation of ADSS on the high voltage line 220kV at the section “Nizhniy Tagil – Raionnaya”. The total length is 20 km.

Backbone electric grids (MES) of Western Siberia

  •   Installation of ADSS on the high voltage line 110kV at the section “Surgutskaya GRES – Surgut SS”. The total length is 3 km.

Motiv, LLC

  •   Installation of ADSS on the high voltage line 110kV at the section “Nizhnya Tura – Nizhniy Tagil”. The total length is 100 km.

Backbone electric grids (MES) of Ural

  •   Installation of FOC on the high voltage line 500kV at the section “Tagil SS – BAZ SS”. The total length is 80 km.

Ashinskiy Metallugicheskiy zavod (Asha Metallurgical Plant), OJSC

  •   Installation of OPGW on the high voltage line 35kV at the section “Amet = AMZ”. The total length is 3 km.

Backbone electric grids (MES) of Ural

  •   Installation of OPGW on the high voltage line 500kV at the section “PGRES – Severnaya”. The total length is 30 km.

Backbone electric grids (MES) of Ural

  •   Installation of OPGW on the high voltage line 220kV at the section “SUGRES – Yuzhnay”. The total length is 50 km.

Backbone electric grids (MES) of Ural

  •   Installation of OPGW on the high voltage line 220kV at the section “Emelino – Trubnaya”. The total length is 65 km.

Backbone electric grids (MES) of Western Siberia

  •   Installation of OPGW on the high voltage line 220 (500) kV  at the section “Tarko-Sale – Urengoy”. The total length is 105 km.

Ekaterinburg Electric Grid Company, OJSC

  • Installation of OPGW on the high voltage line 220kV at the section “SUGRES – Ryabina”. The total length is 1.5 km.

Ekaterinburg Electric Grid Company, OJSC

  • Installation of OPGW on the high voltage line 220kV at the section “Ryabina – Yuzhnay”. The total length is 1.5 km.

Ekaterinburg Electric Grid Company, OJSC

  • Cable laying in the ground at the section “Petrishchevskay SS – Ryabina SS”. The total length is 12km.

Backbone electric grids (MES) of Western Siberia

  • Installation of OPGW on the high voltage line 500kV at the section “Surgutskaya GRES 1 - Somkinskaya”. The total length is 20 km.

NGHT

  • Installation of OPGW on the high voltage line 220kV at the section “Noviy Urengoy - NGHT”. The total length is 35 km.

Energomash

  • Installation of ADSS on the high voltage line 220kV and cable laying in the ground at the section “GTPP – Pervouralskaya SS”. The total length is 3 km.

Inzhenernye seti, LLC

  • Installation of ADSS on the high voltage line 110kV at the section “SS 90 – Krasnaya Gorka”. The total length is 40 km.

SPC Prosoft-E, LLC

  • Development and agreement of technical and system solutions for organization of communication channels and unified information environment of the Perm’ branch of TGC-9, OJSC

Sverdlovenergo, OJSC, Electric grids of Nizhniy Tagil

  • Cable lacing on the high voltage line. Installation of high frequency communication and telecontrol equipment

TGC-9, OJSC, Sverdlovsk heating lines

  • Reconstruction of the communication center. Design, supply and adjustment of equipment.

Mobifon 2000, OJSC

  • Installation of FOC on the high voltage line 110kV at the sections “Ekaterinburg – Nizhniy Tagil”, “Ekaterinburg – Kamensk – Ural’skiy

Ekaterinburg Electric Grid Company, OJSC

  • Supply of SDH and PDH equipment, installation, adjustment and commissioning.

OGK-1, OJSC, Verhnetagilskaya GRES

  • Modernization of the communication system. Design, supply, installation, adjustment of equipment.

OGK-1, OJSC, Iriklinskaya GRES

  •  Creation of the external communication system
  •  Creation of the telephone system based on ATS Si--2000 v.5
  •  Creation of the operative communication system based on the digital system Intron-D. Installation of the structured cabling system.

Energomash, LLC

  •   Design of the external plants of FOL at the section “UETM SS – Kalininskaya SS – Sverdlovskaya SS”
  •   Design of the station communication structures of FOL at the section “UETM SS – Sverdlovskoe RDO”
  •   Installation of FOC
  •   Installation and adjustment equipment at the section “DP RSC – Sverdlovskaya SS”
  •   Supply, installation and adjustment of equipment produced by RAD

Urengoiskaya GRES

  • Supply and installation of communication equipment.

Votkinsk HPP

  • Reconstruction of supervisory control systems

RDK Elektricheskie seti (RDK Electric Grids), LLC

  • Installation of FOC on the high voltage line  at the section “Yuzhnaya SS – Akademicheskaya – Yasnaya – VIZ - Petrishchevskaya”.

Torsion-Telecom, LLC

  • Installation of FOC on the high voltage line  220kV

Urals Power Engineering Company, OJSC

  • Design of FOL on the high voltage line 220 kV

OGK-5, OJSC, Sredneuralskaya GRES

  • Design, supply, installation and adjustment of ATS Avaya Definity